Walkaround throttles and fascia panels: where to put them

Expanding

Benjamin | TrackDrawer.com · published 27 November 2026

Why walkaround changes the layout

A layout run from one fixed control panel can hide its controls in a corner. A walkaround layout cannot: every operator walks with a train, so the controls must be wherever trains go. That turns the fascia, the board that closes off the front of the benchwork, into the layout's control surface.

Three things end up on the fascia:

  • Throttle jacks, where a tethered throttle plugs in, or a holder for a wireless throttle.
  • Local panels with turnout controls for the track in front of them.
  • Paperwork space: a ledge or pocket for car cards, switch lists and a clipboard.

How turnouts are thrown electrically, by solenoid, motor or accessory decoder, is covered in operating turnouts electrically. This article is about where the controls go.

How fast you walk with a train

Scale speed converts to real speed with the scale ratio: mph x 5280 x 12 / scale ratio / 3600 gives inches per second.

Scale speedHO speedHO, time past 8 ftN speedN, time past 8 ft
10 mph2.0 in/s (51 mm/s)48 s1.1 in/s (28 mm/s)87 s
15 mph3.0 in/s (77 mm/s)32 s1.7 in/s (42 mm/s)58 s
30 mph6.1 in/s (154 mm/s)16 s3.3 in/s (84 mm/s)29 s
40 mph8.1 in/s (205 mm/s)12 s4.4 in/s (112 mm/s)22 s
60 mph12.1 in/s (308 mm/s)8 s6.6 in/s (168 mm/s)15 s

What that means in practice:

  • Road trains keep you walking. At 30 to 40 scale mph you move at a slow stroll in HO. You will unplug and replug a tethered throttle every few scenes, so jacks along the main matter.
  • Switching keeps you standing. At 10 mph or less you stay at one spot for minutes. The jack at a town or industry is the one that gets used most.
  • N gives you more time. The same scale speed is about half the real speed in N, so you walk less and can space jacks further apart.

Where the throttle jacks go

Two rules cover almost every layout:

  1. A jack at every work spot. Every town, yard, industry area and staging throat gets a jack, because that is where an operator stands for a while.
  2. No gaps longer than your reach. Between work spots, space the jacks so that the distance between two jacks is less than twice the distance you can comfortably walk while plugged in. Then you can always plug in ahead before you unplug behind.

Measure that reach with your own throttle, standing in your own aisle; it depends on the cord, on how you hold the throttle and on whether the aisle is clear. Wireless throttles relax rule 2, but plugging points and a place to park a throttle are still useful at every work spot.

Put jacks just below the fascia edge, or on a slightly recessed panel, so nobody snags a cord or a sleeve on them. In a narrow aisle, nothing should stick out further than it must. How aisle width works with a peninsula is in peninsula layout design.

Fascia panels for local control

A local panel shows a small track diagram of the scene behind it, with a control at each turnout. Design it so the operator never has to think:

  • Draw the diagram as seen from the aisle. The track on the left of the panel must be the track on the left of the scene. Mirror nothing.
  • One panel per scene. A town gets its own panel in front of it, not a shared panel ten feet away. On an around-the-walls layout that means a panel on each wall where there is work; corners and scene breaks are covered in around-the-walls layout design.
  • Within reach and in sight. You should be able to throw a turnout and see it move without leaning. TrackDrawer flags track more than 25.6 in (650 mm) from the table edge. With a room drawn (a Pro feature) it measures only from the free edges, and you can set the arm reach from 17.7 to 33.5 in (450 to 850 mm); the deepest track you switch should be within that from the fascia.
  • At a comfortable height. The panel sits on the fascia below the track, so the layout height sets the panel height. Choosing the right height for the benchwork is covered in the right height for your layout.
  • Label the spurs. Name each spur on the panel with the industry it serves, the same name that is on the waybills.

Frequently asked questions

How far apart should throttle jacks be?

Close enough that you can always plug in at the next jack before you unplug from the last one. Plus a jack at every town, yard and industry area, where operators stand longest. Measure your own reach with your own throttle and aisle.

Do I still need fascia panels with wireless throttles?

Usually yes. Wireless throttles take care of the train; turnouts at each scene are still quickest to throw with a local control right in front of the track, where you can see the points move.

How fast is 30 scale mph in HO and N?

In HO, 30 scale mph is 6.1 in per second (154 mm/s); in N, 3.3 in per second (84 mm/s). In HO a train at that speed passes 8 ft of layout in 16 seconds.

Where should a fascia panel go on a peninsula?

On the side of the peninsula you operate that scene from, directly in front of the track it controls. If both sides have scenes, each side gets its own panel.

Plan the scenes first

Jacks and panels follow the track plan, so draw the plan with towns, spurs and staging first. Lay it out in the TrackDrawer editor at your real room size, check reach, and mark where each scene will be. TrackDrawer runs in the browser and as an app for iPhone, iPad and Android.

Read also

Open the app · Glossary