Switching layout basics: spurs, runaround and lead

First layout

Benjamin | TrackDrawer.com · published 20 November 2026

The three parts

Spurs. A spur is a dead-end track that serves an industry: a team track, a warehouse, a lumber yard. It ends at a bumper, and its length is counted in car spots. The geometry of dead-end tracks and bumpers is in sidings and buffer stops.

The lead. Every move into or out of a spur starts with the locomotive pulling cars back past the turnout. The track it pulls onto is the lead. If the lead is too short, you cannot clear the turnout with the cars you want to move, and the whole layout locks up. The lead is the most underestimated track on small layouts.

The runaround. A runaround is a passing track with a turnout at each end, long enough to hold the cars while the locomotive runs around them. You need it as soon as a spur faces the "wrong" way, which is explained below.

Facing point and trailing point spurs

Which way a spur faces decides how much work it takes.

  • Trailing point spur. Seen from the direction the train arrives, the turnout points away from the train. The locomotive is at the front, the cars are behind, and the locomotive can back them straight into the spur. One move in, one move out.
  • Facing point spur. The turnout points toward the arriving train. To push cars into the spur, the locomotive has to be behind them. On a point-to-point layout without a runaround, that is impossible. With a runaround, the locomotive leaves the cars on the main, runs around them and shoves them in.

A good switching layout mixes both. Only trailing point spurs make it easy; only facing point spurs make every move a puzzle. Two or three spurs of each kind keep an operating session interesting for an hour.

How long each part must be

Lengths are counted in car lengths. The table uses a 40 ft car and a 50 ft locomotive, both over the couplers, worked out from scale (HO 1:87.1, N 1:160), and the straight length of the standard #4 turnout in Kato Unitrack.

ItemHO (1:87.1)N (1:160)
40 ft car5.5 in (140 mm)3.0 in (76 mm)
50 ft locomotive6.9 in (175 mm)3.8 in (95 mm)
Spur for 2 cars11.0 in (280 mm)6.0 in (152 mm)
Spur for 3 cars16.5 in (420 mm)9.0 in (229 mm)
Lead: locomotive plus 3 cars23.4 in (595 mm)12.8 in (324 mm)
Lead: locomotive plus 5 cars34.4 in (875 mm)18.8 in (476 mm)
Kato #4 turnout, straight route9.7 in (246 mm), 2-840/2-8417.3 in (186 mm), 20-220/20-221

Two practical additions. Leave a little extra at the end of each spur so the last car does not sit on the bumper, and count the spur from the clearance point of the turnout, not from the points: a car standing on the turnout's diverging leg fouls the track next to it. If your cars are longer, rerun the numbers: a 60 ft car is 8.3 in (210 mm) in HO and 4.5 in (114 mm) in N.

A typical small plan

A common US switching layout on a 1 x 8 ft or 2 x 8 ft shelf looks like this, from one end to the other:

  1. A staging track or a cassette at the left end where trains arrive.
  2. A runaround on the main, long enough for the cars you bring in.
  3. Two or three industries with spurs, some facing each way.
  4. A lead at the right end, at least as long as the locomotive plus the longest cut you pull at once.

Since there is no loop, a train makes a run, does its work and goes back to staging. That is the whole session, and it can easily take 30 to 60 minutes with five or six cars. The lengths of the runaround itself are worked out in the runaround track explained. A classic puzzle form of a switching layout, with tracks sized to make it hard on purpose, is covered in the shunting puzzle.

Practical design rules

  • Keep turnouts within reach. You uncouple by hand or with a pick at most spots. TrackDrawer flags track more than 25.6 in (650 mm) from the table edge; with a room drawn (Pro) it measures only from the free edges, so a shelf against the wall has to stay shallow.
  • Keep spurs straight where cars are spotted. Couplers line up better on straight track, and cars stay put.
  • Avoid S-curves in the lead. Pushing cars through two opposite curves with no straight between them can make couplers bind and cars derail.
  • Do not let the lead become a spur. If an industry sits on the lead, every move blocks it.
  • Decide where the cars come from. A switching layout needs a reason for cars to arrive: staging, an interchange, a yard.

Frequently asked questions

What is a switching lead?

A switching lead is a straight track beyond the last turnout where the locomotive pulls cars clear of the turnouts before pushing them into another track. It must hold the locomotive plus the longest cut of cars you move at once.

Do I need a runaround on a switching layout?

Only if you have facing point spurs or your locomotive has to change ends of its train. A layout with only trailing point spurs works without one, but offers less variety.

How many spurs fit on a 2 x 8 ft shelf in HO?

With 40 ft cars, a 2 x 8 ft (61 x 244 cm) shelf typically holds a runaround, three or four short spurs and a lead. Each 3-car spur is 16.5 in of track, and each Kato HO #4 turnout is 9.7 in long, so length runs out before depth does.

Can I practice switching in TrackDrawer?

Yes. In the 3D cab view there is a shunting task: on the sidings of your own plan, or on a practice yard, you put lettered cars in the right order on a target track, and every change of direction counts as a move.

Try it

Draw your spurs, lead and runaround with the track you own and check every length in inches in the TrackDrawer editor. Kato's geometry is listed on the Kato Unitrack HO system page. The app runs in the browser and on iPhone, iPad and Android.

Read also

Track systems in this article

Open the app · Glossary