What staging is for

Staging stands for the rest of the railroad: the trains that arrive from somewhere off the layout and leave for somewhere else. Instead of one train running laps, a session starts with several trains parked in staging, each one ready to come out in its turn. Why staging is usually hidden and how to get at it below the layout is covered in hidden staging and fiddle yards. This article answers two plain questions in inches: how many tracks, and how long.

How many tracks

Count trains, not tracks. A simple way to get the number:

  1. List the trains of one session. A local freight, a through freight, a passenger train, perhaps a second through freight in the other direction.
  2. One track per train that starts in staging. A train that leaves staging at the start and comes back at the end needs its own track for the whole session.
  3. Add one empty track. A rule of thumb, not a measurement: an arriving train needs a free track to go to, and if every track is full, the next train has nowhere to go.

So a session with four trains wants five tracks. If space is short, two short trains can share one long track, one behind the other, as long as the front train leaves first.

Stub-ended or double-ended. A stub-ended yard has turnouts at one end only; trains back in or run in and the locomotive is swapped by hand. A double-ended yard has a throat at each end, so a train can run in at one end and out at the other, which suits a loop or a folded dogbone. It costs a second throat. The folded layout that most often uses a double-ended yard is described in the folded dogbone.

How long each track must be

The track length is the train plus a margin, measured from the clearance point of the last turnout to the bumper. Train length comes from scale: a 40 ft car is 5.5 in (140 mm) in HO and 3.0 in (76 mm) in N, a 50 ft locomotive 6.9 in (175 mm) and 3.8 in (95 mm). For the margin we use one car length, a rule of thumb that leaves room to stop. The sizing logic is the same as for a passing siding and is worked out in more detail in passing siding length.

Then comes the throat. With sectional track the simplest fan is a stair-step ladder: each new track branches from the previous one through a turnout and a compensating curve. In Kato Unitrack N that adds 9.8 in (249 mm) of length per extra track at 33 mm spacing; in Kato Unitrack HO it adds 14.8 in (375 mm) at 74.6 mm spacing. More about ladders, including flex-track ladders, is in yard ladder design.

Yard sizes in N and HO

Length is from the points of the first turnout to the end of the bumper (stub-ended) or from points to points (double-ended). Width is track centers plus one roadbed width, without margin or fascia.

YardWidth1 loco + 10 cars, stub2 locos + 15 cars, stub2 locos + 15 cars, double-ended
N, 3 tracks3.6 in (91 mm)58.8 in (4.9 ft)77.5 in (6.5 ft)94.7 in (7.9 ft)
N, 4 tracks4.9 in (124 mm)68.6 in (5.7 ft)87.4 in (7.3 ft)114.3 in (9.5 ft)
N, 6 tracks7.5 in (190 mm)88.2 in (7.4 ft)107.0 in (8.9 ft)153.5 in (12.8 ft)
N, 8 tracks10.1 in (256 mm)107.8 in (9.0 ft)126.6 in (10.5 ft)192.7 in (16.1 ft)
HO, 3 tracks7.5 in (190 mm)101.3 in (8.4 ft)135.8 in (11.3 ft)161.0 in (13.4 ft)
HO, 4 tracks10.4 in (265 mm)116.1 in (9.7 ft)150.5 in (12.5 ft)190.5 in (15.9 ft)
HO, 6 tracks16.3 in (414 mm)145.6 in (12.1 ft)180.1 in (15.0 ft)249.6 in (20.8 ft)
HO, 8 tracks22.2 in (563 mm)175.1 in (14.6 ft)209.6 in (17.5 ft)308.6 in (25.7 ft)

All figures use Kato #4 turnouts, the Kato end pieces 20-046 (N) and 2-170 (HO) on stub tracks, 40 ft cars and 50 ft locomotives.

What the table says:

  • Width is cheap, length is not. Eight tracks of N staging are only 10.1 in wide. The throat, though, grows by 9.8 in for every track you add.
  • HO staging wants a long wall. Four HO tracks for 15-car trains need 12.5 ft, more than many rooms offer in one straight run. That is why HO staging often sits along the longest wall or under the main layout.
  • Double-ended doubles the throat. In HO a 6-track double-ended yard grows from 15.0 to 20.8 ft compared with stub-ended. Only take it if your track plan really needs run-through trains.

Practical points

  • Keep the throat in reach. Most derailments in staging happen on the turnouts. Put the throat where you can reach it without moving scenery.
  • Straight tracks in staging. Curved staging tracks are possible, but cars on a curve are harder to see and to rerail.
  • Label the tracks. Number them on the fascia, and give each train a home track, so a session always starts the same way.
  • Watch the clearance at the last track. In a stair-step ladder the outermost track is the one that reaches full spacing last. Measure its length from there.

Frequently asked questions

How many staging tracks do I need?

One per train that starts the session in staging, plus one empty track for an arriving train. A session with four trains wants five tracks.

How long should staging tracks be?

As long as the longest train that will stand there, plus about one car length of margin. In Kato Unitrack N a train of two locomotives and 15 cars of 40 ft needs 55.5 in (1410 mm) of clear track.

Is a stub-ended staging yard good enough?

For a point-to-point layout, yes: trains run in, and later leave by backing out or after the locomotive is swapped by hand. If trains should run through staging and out the other end, you need a double-ended yard and the second throat that comes with it.

Can staging be shorter than my trains?

Only if you break trains in two, which works on a fiddle yard where you handle cars by hand. For trains that run in and out under their own power, every track must hold its train.

Plan your staging