After that come buffer stops for sidings, straights for length and, if the system has one, a second radius for a second loop.
An order that usually works
- A pair of turnouts with their partners. A passing loop needs a left and a right turnout, the reverse curves that bring the diverging track parallel again, and straights as long as the straight route through the turnout. Miss one of those three and it will not close.
- Buffer stops. With a turnout and a buffer stop you have a siding: a place where a wagon or a short train waits.
- Straights. They make the layout longer and the passing loop roomier. What a longer passing loop gives in train length is in train length and station length.
- A second radius. Curves on a wider radius give a second loop around the first. That only works in systems with more than one radius, and it needs a deeper board.
For Märklin C track the packs C1 to C3 and their plans are already worked out, as are the Duplo sets in expanding a Duplo train track. Here we take two other examples: Märklin my world, and the C track packs not measured there.
Example: Märklin my world
My world is Märklin's toy track in H0 size, with battery trains and a single radius of 360 mm. We gave the Auto-designer the track from two starter sets, with and without an extension set, and let it try every shape on the floor. Sizes include the roadbed.
| Track | Plan with the most possibilities | Pieces | Track | On the floor |
|---|---|---|---|---|
| figure-of-eight starter set | figure of eight with crossing | 23 | 4.34 m | 95.3 x 148 cm |
| figure-of-eight starter set + turnout set 23401 | figure of eight with crossing | 23 | 4.34 m | 95.3 x 148 cm |
| figure-of-eight starter set + 23400 | oval with passing loop | 22 | 4.10 m | 148 x 76 cm |
| figure-of-eight starter set + 23400 | dogbone with passing loop | 30 | 5.60 m | 210.4 x 112 cm |
| figure-of-eight starter set + 23400 + 3 buffer stops | dogbone with 2 sidings | 34 | 6.14 m | 210.4 x 112 cm |
| starter set with turnouts (old) | rhombus, no turnouts | 22 | 4.05 m | 148 x 105.7 cm |
| starter set with turnouts (old) + 3 buffer stops | rhombus with 2 sidings | 26 | 4.59 m | 148 x 105.7 cm |
| starter set with turnouts (old) + 23400 | oval with passing loop | 25 | 4.66 m | 166.8 x 76 cm |
| starter set with turnouts (old) + 23400 | hexagon with 2 passing loops | 34 | 6.29 m | 184 x 169.5 cm |
What this tells you:
- The turnout set alone does nothing for the figure of eight. That starter set has curves and a crossing but not a single straight. With only the turnout set 23401 added, the designer found no plan with turnouts.
- 23400 brings the passing loop. Besides a pair of turnouts and four curves, this set has eight 180 mm straights. With both starter sets the designer used it to lay a passing loop.
- Buffer stops turn the old turnouts into sidings. The older starter set with turnouts gave no plan with turnouts from the box alone. With three 23978 buffer stops added, they became two sidings.
- The older set with 23400 is the richest combination. With two pairs of turnouts in stock the designer laid a hexagon with two passing loops of 6.29 m; a dogbone with one passing loop came out just as long.
How much space my world needs in general, with a plan per floor size, is in Märklin my world: how much floor.
Example: C track packs C2, C4 and C5
For C track we gave the designer the starter set with one pack at a time, four goals and a 5 cm margin:
| Track | Board | Plan with the most possibilities | Pieces | Track |
|---|---|---|---|---|
| starter set + C2 | 175 x 105 cm | oval R2 with passing loop | 22 | 4.56 m |
| starter set + C4 | 175 x 105 cm | oval R2, curved turnouts unused | 20 | 4.19 m |
| starter set + C4 | 250 x 120 cm | oval R2 | 24 | 4.94 m |
| starter set + C5 | 250 x 120 cm | oval R2 with 2 sidings | 39 | 7.27 m |
- C2 alone already gives a passing loop, on the board of the starter set oval. C1 adds a siding to that.
- C4 needs more R1 curves. The curved turnouts in C4 have an inner route on R1, and C4 has only two R1 curves. The designer therefore did not use them, just as with C3. On 250 x 120 cm the extra straights and R2 curves mainly added length.
- C5 gives length and sidings. On 250 x 120 cm it became a 7.27 m oval with two sidings. The double slip 24624 appeared in no variant: it belongs between two parallel tracks, and no such plan came out with these pieces.
Length or possibilities?
An addition gives length or possibilities, rarely both on the same board. Straights make a loop longer, but a train keeps going round. A pair of turnouts hardly lengthens the loop, but gives a second train a place to wait. If you mainly want to watch trains run, choose length first; if you want to shunt or run two trains, choose turnouts first.
Allow for space too. With the old my world set and 23400 the oval with passing loop grew to 166.8 cm long, against 148 cm for the plain oval. LEGO track works the same way: LEGO train layout ideas shows what the 60238 turnout set adds.
Frequently asked questions
Do I buy turnouts first or straights first?
A pair of turnouts with their partners first, if you want two trains or a station. Straights alone make a run longer but change nothing about what you can do.
Why does the designer not use my curved turnouts?
A curved turnout has an inner route on a tighter radius than the starter set. In C track that is R1, and without enough R1 curves the inner loop cannot close.
Do I need C1 for a passing loop in C track?
No. With the starter set and C2 the designer laid an oval with a passing loop on 175 x 105 cm. C1 adds a siding.
Try your next step
Put your starter set and the extension you are considering together in your stock in the app, and let the Auto-designer show what changes. If it does not work, remove the set again and try another.