The formula, three ways

Everything in this article comes from one line:

grade (%) = rise / run x 100

Both measurements in the same unit, measured along the track. From it follow the two forms you actually use at the bench:

  • Rise per foot = grade x 12 in / 100. At 2 percent that is 0.24 in.
  • Run needed = rise / (grade / 100). To climb 3 in at 2 percent: 3 / 0.02 = 150 in, or 12.5 ft.

You will also see grades written as a ratio. "1 in 50" means 1 unit of rise per 50 units of run, which is 2 percent. "1 in 33" is 3.03 percent. The percentage is the same in every scale: 2 percent in N is just as steep as 2 percent in HO. Why model trains handle about 3 percent at most, and why long trains want less, is explained in gradients: how steep can a model train climb. This article is the arithmetic in inches.

Rise per foot, 1 to 4 percent

GradeRatioRise per footRise per 8 ftRise over a 24 in level
1%1 in 1000.12 in (3.0 mm)0.96 in (24 mm)0.24 in
1.5%1 in 670.18 in (4.6 mm)1.44 in (37 mm)0.36 in
2%1 in 500.24 in (6.1 mm)1.92 in (49 mm)0.48 in
2.5%1 in 400.30 in (7.6 mm)2.40 in (61 mm)0.60 in
3%1 in 330.36 in (9.1 mm)2.88 in (73 mm)0.72 in
3.5%1 in 290.42 in (10.7 mm)3.36 in (85 mm)0.84 in
4%1 in 250.48 in (12.2 mm)3.84 in (98 mm)0.96 in

The last column is a quick check during construction. Lay a 24 in level on the subroadbed, lift the low end until the bubble centers, and measure the gap under it. At 2 percent that gap is 0.48 in, just under half an inch.

How much run to clear another track

The rise you need for an over-and-under crossing is the clearance above the lower rail plus the thickness of everything above it. For the table we use TrackDrawer's default height per helix turn, which adds the structure gauge, the rail height and a 10 mm (0.39 in) deck: 75 mm (2.95 in) in HO and 45 mm (1.77 in) in N. The default clearance the plan check asks for is 70 mm (2.76 in).

GradeRun for HO, 2.95 in (75 mm)Run for N, 1.77 in (45 mm)Run for 3 inRun for 2 in
1.5%16.4 ft (5.00 m)9.8 ft (3.00 m)16.7 ft11.1 ft
2%12.3 ft (3.75 m)7.4 ft (2.25 m)12.5 ft8.3 ft
2.5%9.8 ft (3.00 m)5.9 ft (1.80 m)10.0 ft6.7 ft
3%8.2 ft (2.50 m)4.9 ft (1.50 m)8.3 ft5.6 ft
4%6.2 ft (1.88 m)3.7 ft (1.13 m)6.3 ft4.2 ft

Two practical shortcuts:

  • Split the difference. If the upper track climbs and the lower track descends, each only needs half the rise. HO at 2 percent then needs two grades of 6.2 ft instead of one of 12.3 ft. The total grade length is the same, but each line climbs less.
  • Add the transitions. The table is pure climb. You also need an easement where the grade starts and ends, so long cars do not ground on a kink. The helix assistant in TrackDrawer runs its lead-in and lead-out at half the grade; doing the same on a ramp adds length at each end.

If no plan has 12 ft of run to spare, the climb has to be stacked or stretched around the room; that choice is in nolix or helix.

Riser heights for open-grid or L-girder benchwork

On open benchwork the grade is set by the risers that hold the subroadbed. With joists every 16 in, each riser along the grade is taller than the previous one by grade x 16 in:

GradeStep per 16 in joistAfter 8 joists (10.7 ft)
1.5%0.24 in (6.1 mm)1.92 in (49 mm)
2%0.32 in (8.1 mm)2.56 in (65 mm)
2.5%0.40 in (10.2 mm)3.20 in (81 mm)
3%0.48 in (12.2 mm)3.84 in (98 mm)

The 16 in spacing is a common carpentry choice, not a rule; with 24 in joists the step is 1.5 times larger. Measure the run along the track centerline, not along the joists, when the grade runs through a curve. How the risers sit on the joists is part of L-girder benchwork.

Grades on sectional track

On sectional track with roadbed, the grade shows up per piece. A Kato Unitrack N 20-000 straight is 248 mm (9.76 in), a Kato HO 2-150 straight 246 mm (9.69 in): almost the same length, so the step per piece is almost the same in both scales.

GradeRise per Kato N 20-000 (248 mm)Rise per Kato HO 2-150 (246 mm)
1%2.48 mm (0.10 in)2.46 mm (0.10 in)
2%4.96 mm (0.20 in)4.92 mm (0.19 in)
3%7.44 mm (0.29 in)7.38 mm (0.29 in)
4%9.92 mm (0.39 in)9.84 mm (0.39 in)

At 2 percent each straight sits about 5 mm (0.2 in) higher than the one before. Support the joint, not just the middle of the piece, so the grade stays even.

Frequently asked questions

How do I calculate the grade on a model railroad?

Measure the rise between two points on the track and the length of track between them, in the same unit. Divide rise by run and multiply by 100. A rise of 1 in over 50 in of track is 2 percent.

How many inches per foot is a 2 percent grade?

0.24 in per foot, or just under 1/4 in. Over a full 8 ft sheet of plywood, 2 percent climbs 1.92 in.

How long a grade do I need to go over another track in HO?

About 12.3 ft at 2 percent for 2.95 in (75 mm) of rise, or 8.2 ft at 3 percent. If the lower track drops while the upper one climbs, each needs half the rise.

Is grade measured along the track or straight across the room?

Along the track. In a curve the track is longer than the straight-line distance, so measure along the centerline.

Check the grade in your plan

In the TrackDrawer editor, the Distribute gradient tool spreads a climb over a chain of pieces, watches the percentage against your maximum (3 percent by default) and checks the clearance under every bridge. Gradients and bridges are part of Pro; how to set one up step by step is in making a gradient and a bridge.

Read also

Track plans with Kato Unitrack N in the Railfolio

All Kato Unitrack N track plans in the Railfolio

Track systems in this article

Open the app · Glossary